Manually Guided Transporters

Manually Guided Transporters in the Energy Industry. An MGV can be as big or as small as the application demands. At Handling Specialty, we don’t really build small. These robust MGVs are an excellent example of just how big we build. Providing real-life solutions for heavy manufacturing is what we do. In 2018 Handling Specialty […]

Material Handling Accounting

Meet Debbie Guild, with Handling Specialty since 1979! On May 20, 1979, I received a phone call for an interview. I agreed to meet the gentleman who called. Then on May 25, 1979, he picked me up at the end of my street in a white Cadillac. On our drive from Grimsby to Mississauga, he […]

Russell Johnston to Receive Prestigious Award

The Council of the Ontario Association of Certified Engineering Technicians and Technologists has awarded Russell Johnston, of Handling Specialty, the George Burwash Langford Memorial award in recognition of outstanding technical expertise while working at Handling Specialty and actively mentoring the next generation of engineering technologists. As an Engineer, George Burwash Langford felt a strong sense […]

Manufacturing for Manufacturers

Who Manufactures Equipment for the Manufacturers? Every large, complex product requires an equally complex design around the manufacturing of the said product. This is where Handling Specialty’s slogan: “We build big things so our customers can build big things,” really fleshes out what they specialize in. Supplying custom material handling equipment for industries like aerospace, […]

Turnkey Projects are Our Specialty

Handling Specialty has been designing and manufacturing Custom material handling systems for more than fifty years. When approached by our client in Waukesha, Wisconsin, concerning their project in Welland, Ontario, Canada, to design flexible, robust, reliable and safe production assembly systems, we eagerly accepted the challenge. The 450,000-square-foot greenfield facility, created to assemble massive internal […]

Meet our Project Manager

I am now in my sixth year as a project manager with HSML, joining in July 2013 to lead a Nuclear project. That project was a massive challenge for HSML. Still, it did result in several successful machine installs at the Nuclear site to assist a 10-year retrofit of 3,500MW reactor power output – about […]