Vertical Assembly Lift for Turbine/Rotor Stacking

Overview Turbine assembly lifts are often designed to be fitted into existing pits allowing for greater safety during the assembly process and keeping all moving parts of the four-post lift below grade. This accommodates the ergonomic requirement as well, allowing technicians to work at a single stage with easy access to tooling and parts while […]
Steel Coil Handling Equipment

Overview This steel coil handling equipment was designed to handle a uniform load of steel coil, managing 2 Cycles per shift / 2 shifts per day / 1450 cycles per year. Engineered for strength and structural rigidity, this four-post lift operates via 4 ball screws and is capable of lifting up to 100,000 lbs. Features […]
Pit Lift for Turbine Assembly

Overview Handling Specialty engineered and manufactured this Pit Lift for Turbine Assembly – mounted in a pit to raise and lower turbine engines and gas compressors for assembly and disassembly. Simple design keeps maintenance costs low, and the ability to stop motion with a full load at any point without experiencing downward creep of the […]
In-Ground Lift System for Turbine Assembly

Overview The below-ground, or ground-level lift, allows the employees to remain on the ground as the turbine raises and lowers at the worker’s level, rather than the employee raising and lowering on a platform to meet the different segments of the turbine. The ground-level lift eliminates staircases and heights associated with traditional above-ground turbine lifts, […]
Four Post Lift for Rotor Assembly

Overview Handling Specialty engineered and manufactured a large four-post mechanical lift (Cargovator) to lift personnel and materials during the assembly of compressor rotors. Features Platform movement is smooth and level throughout the range of travel. The platform is 20’ x 20’ with a center opening to allow access to the compressor rotor. The platform includes […]
Multi Stage Scissor Lift for Turbine Assembly

Overview Handling Specialty was asked to quote on a vertical assembly platform that is being used during the assembly process for large energy turbines. The lift is mounted in a pit and rises approximately 35 feet, safely holding personnel and equipment as the turbine assembly is completed. The platform features 3 (three) round removable plates, […]