Split rail system scissor lift

Handling Specialty was asked to replace a Split rail system in an existing maintenance facility for a major transportation company in Toronto. This upgrade included removing their existing six scissor lifts, rebuilding and re-installing them, removing their single existing wheel lifting trolley and designing, manufacturing and installing two new battery-operated wheel lifting trolleys, and removing their existing six manually operated split rail systems and designing, manufacturing and installing six new electro-mechanical split rail systems.

Here you can watch the scissor lifts designed to work in tandem with the other equipment.

Recent News

2025-advance
AGV with Rail Trucks
IAAPA expo 2024
Ben D'Souza - Handling Specialty President
CHCH pic

We Build Big Things to Help Our Customers Build Big Things.

Contact us today to schedule a consultation.