Search
Close this search box.

Bogie/Truck Maintenance Station

Bogie/Truck Maintenance Station

Custom designed and built to lift bogie trucks for inspection and maintenance.

Solution: 5556
Industry: Rail Transit MRO and Manufacturing Solutions
Model: TS-02
Type: Multi Stage Lift
Actuation: Mechanical
Dimensions: 216" × 143" × 128"
Travel: 72"
Capacity: 22,000 lbs

Overview

This customized Bogie/Truck Maintenance Station is used to replace traction motors and wheelsets on Rail bogies. Rail maintenance is an important part of keeping a fleet operating safely and efficiently.

Features

This rail maintenance system is feature-rich. Examples below.

Examples below.

  • Four Clamp Arms to secure equipment in place
  • Four support arm locking pins
  • Four control panels including one Master with HDMI screen
  • Limit Switches
  • Overtravel Limit Switches
  • Four handheld pendants
  • Two work platforms
  • Two articulating staircases
  • Two Jacks traverse on tracks

Products

Capture-1-B-McD
DSC_0496-small
RAIL-BOGIE-Lowered
DSC01569
Bogie-work-platform
4-post-lift-4-v3
1 2

Gallery

Product Videos

We Build Big Things to Help Our Customers Build Big Things.

Contact us today to schedule a consultation.